Research: Research Fund for Coal and Steel (RFCS)
- 2011 - 2012 Preco+
Dissemination project for composite dowel bars
- 2010 - 2014 EcoBridge
Pilot project for composite dowel bars
- 2009 - 2010 INTAB+
Dissemination project for composite bridges with integral abutments
- 2008 - 2011 ELEM
Project manager for system development of composite element bridges
- 2006 - 2009 PrecoBeam
Initiation, management and coordination of the development of VFT-WIB girders and introduction in Europe
Research projects for FOSTA
- 2017 - 2019 P 1281 IntegBridge
Integral and holistic planning of road bridges based on hierarchical models
- 2015 - 2017 P 1033 DynaFrame
Investigation of the dynamic behaviour of composite frame bridges for railways
- 2011 - 2014 P 967 Bridges with external reinforcement
Composite dowel bars: anchorage length and influence of transverse tensile loading
- 2009 - 2011 P 804 General technical approval for bonded dowels
Obtaining general technical approval for bonded anchors in the construction industry
- 2007 - 2010 P 757 Lightweight steel composite
Composite structures made of high-strength steel in combination with UHPC
Development of new floor systems in lightweight steel composite
- 2004 - 2006 P 629 Efficient composite bridges
Composite bridges of small and medium spans
Federal Ministry for Economic Affairs and Energy (PtJ)
- 2014 - 2017 HyConCast
Hybrid substructure made of high-strength concrete and ductile cast iron for offshore wind turbines
https://www.hyconcast.uni-hannover.de/
Future Building Research Initiative (BBSR)
- 2014 - 2017 SF-10.08.18.7-11.14/ II 3-F20-10-1-132
Wall elements made from high-performance concrete